This 10,000 square foot addition to the existing building includes a 750 seat sanctuary, nursery, commissary, restrooms, foyer, baptistery/dressing and lower level choir rehearsal room. Building structure is metal frame with brick veneer. This project included phased relocation of existing M&E systems, detailed design and coordination of sanctuary sound and dimming systems, multiple self-contained HVAC systems and energy-efficient CO2 sensor and economizer outdoor air controls. Client Contact: Mr. Tom Cruze, Architecture etc, PSC (859) 272-3944.



This 6,400 addition included a 250 seat multipurpose room and several classrooms. The building structure was exposed laminated wood beam with brick veneer. Connolly Consulting Engineers’  scope of work included mechanical and plumbing design, detailed coordination with electrical consultant, bidding documents and construction observations. Client Contact: Mr. Eddie Ouellette, EOA Architects, (859) 948-6346.




This renovation of an existing gymnasium into a middle school sanctuary and “party room” involved creative integration of gymnasium lighting systems with new cost-effective lighting themes and materials. Value engineering and analysis of existing HVAC systems and facility code compliance issues was also applied.  Sound, video and dimming systems design/coordination included a state of the art sound and video recording booth, multiple projectors, and eye-catching LED in glass block lighting effects. Client Contact: Mr. Jim Cox, Director of Facilities, Southland Christian Church (859) 224-1696.



 
Top